Snagging: the technical inspection before you take handover of your flat in Dubai
What snagging is, when it is done, what gets checked across more than 100 points and how you make the developer fix it before it hands you the keys. For resales too, and without you having to fly in from Spain.

What is snagging and why is it done before you accept the keys?
Snagging is the technical inspection of the flat before you accept handover. It is checked room by room, everything that is not right is logged with a photo, and the developer is asked to repair it before you sign the handover certificate and collect the keys. If you bought off-plan, it is the last moment when you have full leverage to insist.
The reason is simple. Until you have accepted the flat, fixing it is part of the developer's obligation to hand it over in good condition. Once you have signed for it, every defect becomes a warranty claim: you have to prove it was there from the start, wait your turn with after-sales and, often, arrange the technician's visit with a tenant living there. Whatever is not logged on handover day costs much more to claim afterwards.
A snag is a small defect: a cracked tile, a socket with no power, a door that catches, a badly sealed joint. They are hardly ever serious, but in a flat you plan to rent out from the first month, each one is a tenant complaint, a bad review or a week without income.
When is the inspection done?
It depends on how you buy.
- Off-plan, when construction finishes. When the developer announces handover, it invites you to inspect the flat before giving you the keys. That is when snagging happens. The exact order (final payment, inspection, handover) is set by your contract with the developer, so it is worth reading it before the notice arrives. If you bought off-plan, this guide explains how payments and the Oqood registration work up to that day.
- Developer's ready stock. The flat is finished but nobody has lived in it. It is inspected just like an off-plan flat, before signing and handover.
- Resale. It is inspected before you commit: at the latest, before you sign Form F. Whatever is wrong is negotiated into the price or fixed by the seller before the transfer.
In the first two cases there are usually two visits: the full inspection and, when the developer says it has been fixed, a second check of the list, point by point. Nothing is closed just because an email says so.
What gets checked in a snagging inspection?
We check more than 100 points, with a photo and location for each issue. These are the groups and how each one is checked:
- Finishes: floors (cracked, hollow or uneven tiles), walls and ceilings (cracks, stains, paint), skirting boards, and joints and sealing in bathrooms and kitchen. They are checked with raking light, which is how the defects that ceiling lights hide show up.
- Plumbing: pressure and flow at every tap, hot water, drains with the water running for a while, leaks under basins and the kitchen sink, cisterns and sanitaryware. A slow drain on handover day is a blockage in the first month of the tenancy.
- Electrics: every socket with a tester, switches, light points and the consumer unit, with each circuit labelled.
- Air conditioning: the AC in every room switched on long enough to see whether it really cools, thermostats, grilles and the condensate drain. In Dubai it is the system that works hardest and the one that gives tenants the most trouble.
- External doors and windows: windows and balcony doors (locks, tracks, seals and weathertightness). Dust and sand get in wherever the sealing fails.
- Internal joinery: doors that catch or do not close, wardrobes, handles, hinges and locks.
- Kitchen and appliances included: that the ones listed in the contract are there and that they all work.
- Balcony and terrace: fall and drainage, railings, flooring.
- Common areas and access: the condition of the landing, and that you are given access cards, garage remotes and a parking space if you bought one.
What defects turn up at handover?
No two handovers are the same, but the defects fall into the same families. So you know what to look for if you are in the flat yourself:
- Incomplete silicone sealing in showers, baths and worktops.
- Floor or wall tiles that sound hollow when you tap them.
- Sockets with no power or switches that do not control the light they should.
- Air conditioning that runs but does not cool a room properly, or that drips.
- Doors that catch on the floor or do not fit the frame.
- Construction leftovers: paint on glass and frames, scratches on worktops and on window profiles.
- Windows that do not close fully or let air through.
- Appliances that are missing or are not the ones listed in the contract.
None of them looks serious on the visit. With the flat let, each one is a call from the tenant and a technician's visit that you pay for or have to chase under warranty.
How do you make the developer fix it?
- Written report. Each issue numbered, with a photo, the room and a description. It is the document handed to the developer and the one used later to check.
- Formal submission. It is sent through the channel the developer sets for handover, so the date is on record.
- Repair and second check. When the developer says it has been fixed, we go back to the flat with the list and check it point by point. Anything still wrong goes back on the list.
- Handover certificate. Any minor items still outstanding are written into the certificate before it is signed. A defect that is not on any piece of paper is, as far as the developer is concerned, a defect that never existed.
The most expensive mistake is accepting the keys on the strength of "we'll fix that next week". Maybe they will. But if it is not in writing, next week is when the claim starts.
What warranties do you have after handover?
Snagging does not replace the legal warranties; it puts on record how the flat was handed over to you. After handover, the developer is liable:
- For one year on the installations: electrics, plumbing and drainage.
- For ten years on structural defects, under the UAE Civil Code (art. 880) and Dubai Law 6/2019 on jointly owned property.
If a defect appears within that year, you claim against the developer with photos and the date. This is where the handover report is useful again: it shows that the fault was not there, or that it had already been flagged.
What if you buy a resale flat?
In a resale there is no developer to ask to fix anything: the seller hands the flat over as it is. That is why the inspection is done before you commit, and its findings become part of the negotiation. If something is wrong, either it comes off the price or the seller repairs it before signing at the Trustee Office.
Besides the flat itself, in a resale we look at what you cannot see on the viewing: that the deed and the seller are in order in the Dubai REST app, and that the service charges are paid (checked in Mollak, the Dubai Land Department's system for owners' associations). A service charge debt blocks the developer's no-dues certificate and, with it, the transfer. The full process is in how to buy a ready property.
If the flat is let and you buy it with the tenant in place, the visit is usually shorter. We check what we can and ask for the tenancy contract registered in the Ejari.
What changes if you live in Spain?
You do not have to get on a plane for handover. We carry out the inspection for you, send you the report with photos so you can see it before it goes to the developer, submit it and check again when they say it has been fixed. All you do is approve the final report.
What is worth sorting out in good time is who collects the keys and signs the certificate on your behalf. If you are not going to be there, you need an authorisation or a power of attorney: we tell you which one your building's developer asks for.
And think about what comes next. With the keys in hand, the setup begins: water and electricity with DEWA, internet and, if you are going to let it, the Ejari or the holiday home permit. We cover it in DEWA, internet and Ejari.
The most costly mistakes at handover
- Signing the certificate without inspecting. It means giving up the strongest position you will ever have.
- Inspecting in a hurry and without a method. A quick walk-round finds the obvious things and misses the drains, the AC and the sealing.
- Accepting verbal promises. Everything outstanding, in writing and with a photo.
- Not checking again. An "it's fixed" is verified in the flat, not in an email.
- Letting the flat before the list is closed. With a tenant in, every repair is twice as hard to arrange.
Frequently asked questions
What is snagging?
Snagging is the technical inspection of a flat before you accept handover. It is checked room by room, everything that is not right is logged with a photo, such as a cracked tile, a socket with no power or a door that catches, and the developer repairs it before handing over the keys.
When is snagging done in Dubai?
For an off-plan flat or a developer's ready stock, when the developer calls handover and before you sign the certificate and collect the keys; the norm is a full inspection and a second check when the developer says it has been fixed. In a resale, before committing, at the latest before signing Form F.
What gets checked in a snagging inspection?
Finishes, plumbing, electrics, air conditioning, windows and balcony doors, internal joinery, the kitchen and included appliances, the balcony, and common areas and access. Calina Real Estate checks more than 100 points, with a photo and location for each issue.
What warranty does a new flat in Dubai have?
The developer is liable for one year on the installations (electrics, plumbing and drainage) and for ten years on structural defects, under article 880 of the UAE Civil Code and Dubai Law 6/2019. Snagging does not replace those warranties, but it puts on record how the flat was handed over.
Is snagging done on a resale flat?
Yes, before committing to buy. In a resale there is no developer to carry out repairs: whatever is wrong comes off the price or is fixed by the seller before signing. We also check in Dubai REST that the deed is in order and in Mollak that the service charges are paid.
Do you have to travel to Dubai for snagging?
No. Calina Real Estate carries out the inspection for the buyer, sends them the report with photos, submits it to the developer and checks again when they say it has been fixed. The buyer only approves the final report and arranges who collects the keys on their behalf.